Mid-Term Management Plan

ASKA Pharmaceutical Holdings Mid-Term Management Plan 2028

Positioning of Mid-Term Management Plan 2028 and Growth Strategy

The Mid-Term Management Plan 2028 serves as the first phase of the roadmap toward realizing ASKA VISION 2035. Based on a strategy consisting of two foundations and five strategic pillars, the plan aims to achieve both the steady growth of existing businesses and the establishment of future growth platforms, thereby building a sustainable earnings base.
By the final year of the plan, fiscal 2028, ASKA Pharmaceutical Holdings aims to achieve net sales of ¥85.0 billion. At the same time, the Company will further strengthen its business foundation with a view toward the early achievement of ¥100.0 billion in net sales, supporting long-term sustainable growth.

Our Purpose

We will realize a healthy tomorrow and future for all lives

Our Vision

Toward a Specialty Healthcare Company Based in Japan, Pioneering the Future Globally

Mid-Term Management Plan 2028

Slogan

Deepening Our Core Strengths and Building the Business Foundation to Support Global Expansion for Sustainable Growth

FY2028 Financial Targets

Net Sales

¥85.0billion

Operating Profit Margin

10%

ROE

10%

Total payout ratio

40%

The Five Pillars Driving Growth

Domestic Pharmaceutical

Strengthening Profitability through Further Expansion in Specialty Areas

Drug Discovery

Accelerating Global Expansion

Global

Strengthening Business Foundations through New Plant Operations

Animal Health

Expanding Business through New Product Launches and Overseas Expansion

Testing and Around-the-Pill

Expanding the Testing Business through Trace Analysis Technologies and Broadening into Adjacent Healthcare Fields

Two Strategic Foundations

Financial Strategy

Advanced management with a focus on the cost of capital

Strengthening the Management Foundation

Strengthening the management infrastructure to execute strategies

6 Material Issues

1

Promotion of environmental management

2

Developing diverse human resources to enhance corporate value

3

Contributing to women's health and animal health

4

Stable supply of high-quality products and provision of appropriate information

5

Respect for human rights

6

Strengthening governance

ASKA Pharmaceutical Holdings' VISION 2035

To achieve sustainable growth and continue contributing to society over the next decade and beyond, ASKA Pharmaceutical Holdings has established its “Vision for 2035.” Through purpose-driven business management and execution, we will realize our Vision for 2035 and continue creating value for all stakeholders.

VISION 2035

Management Policy

Guided by our long-term vision, ASKA VISION 2035, the Group is committed to purpose-driven management to remain a company that is trusted by society and continuously creates sustainable value.
In our core prescription pharmaceuticals business, we will further expand our presence in specialty areas, particularly in the fields of obstetrics and gynecology and thyroid disorders. At the same time, we will continue to contribute to healthcare by strengthening drug discovery research and leveraging open innovation to create pharmaceuticals that address evolving societal needs.
Building on our established business foundation, we will further expand our global business while advancing into the animal health and testing & around-the-pill businesses. Through these initiatives, we aim to become a Total Healthcare Company that covers the entire healthcare value chain—from prevention, testing, and diagnosis to treatment and prognosis—while expanding our business both in Japan and overseas.
In addition, under the Mid-Term Management Plan 2028, we will advance our growth strategy based on the Five Pillars and Two Strategic Foundations. By enhancing management with a strong awareness of capital costs and strengthening our management foundation, we will improve profitability and achieve sustainable growth in corporate value.

Mid-Term Management Plan 2028: Financial Targets

The Mid-Term Management Plan 2028 represents the first phase of the roadmap toward realizing ASKA VISION 2035. Through the dual pursuit of steady growth in existing businesses and the establishment of future growth platforms, the Plan aims to build a sustainable earnings base.
By the final year of the Plan, fiscal 2028, the Company targets net sales of ¥85.0 billion. At the same time, it will continue to strengthen its business foundation with a view toward the early achievement of ¥100.0 billion in net sales, supporting the next stage of growth and long-term value creation.

FY2028 Financial Targets

Net Sales

¥85.0billion

Operating Profit Margin

10%

ROE

10%

Total payout ratio

40%

Mid-Term Management Plan 2028: Growth Strategy

Under the Mid-Term Management Plan 2028, we will execute our growth strategy based on the Five Pillars and Two Strategic Foundations.

The Five Pillars Driving Growth

The Group has identified the businesses that will drive its future growth as the Five Pillars. By strategically allocating management resources to these priority areas, we will accelerate growth and strengthen our long-term competitiveness.

Domestic Pharmaceutical

― Strengthening Profitability through Further Expansion in Specialty Areas ―

We will further strengthen our presence in specialty areas, particularly in the fields of obstetrics and gynecology and thyroid disorders, which represent our core therapeutic areas. Looking ahead to future business growth, we will continue contributing to society by addressing health issues arising from sex-based differences. To support expansion into new therapeutic areas, we will actively pursue the acquisition of new rights and the enhancement of our pipeline, while making strategic investments with a view not only to the Japanese market but also to commercialization across Asia.
In addition, we will continue building the foundation for offering new treatment options beyond pharmaceuticals by advancing the development of launch and service infrastructures for our digital therapeutics currently under development. Through these initiatives, we aim to strengthen our earnings base and achieve sustainable growth.

Drug Discovery

― Accelerating Global Expansion ―

To establish a leading position in specialty areas both in Japan and overseas, we will strengthen our drug discovery research platform, with a focus on gynecological disease models and ion channel–targeted drug discovery. In addition, through the promotion of open innovation, we will incorporate new modalities, including antibodies and mid-sized molecules, to further enhance our drug discovery capabilities.
We will also maximize the value of our assets through out-licensing and collaborative development partnerships, creating medium- to long-term revenue opportunities. Furthermore, we will continue advancing our pipeline into later stages of clinical development while promoting the global expansion of proprietary assets, including AKP-009 and AKP-017. Through these initiatives, we aim to strengthen our global presence and establish a sustainable growth platform.

Global

― Strengthening Business Foundations through New Plant Operations ―

At Hataphar in Vietnam, we will strengthen our business foundation through the operation of a new manufacturing facility scheduled to commence commercial production in 2026. Leveraging this new plant, we will expand our portfolio of competitive products, including specialty products, to increase market share and improve profitability.
We will also accelerate business expansion across Southeast Asia, with a particular focus on Vietnam and the Philippines. In addition to enhancing our product supply capabilities to address local market needs, we will increase our presence in overseas markets through initiatives such as the introduction of ASKA products and the expansion of our regional business operations.

Animal Health

― Driving Business Growth through New Product Launches and Global Expansion ―

We will continue to expand our portfolio of products for both livestock and companion animals, focusing on areas where we have established strengths, including reproduction and endocrinology. In overseas markets, we will accelerate expansion primarily across Asia through the introduction of veterinary pharmaceuticals, supplements, and other products, thereby generating revenue opportunities at an early stage.
Through the continued growth of our Animal Health business, we aim to contribute to a society in which people and animals can live together in harmony.

Testing and Around-the-Pill

― Expanding the Testing Business through Trace Analysis Technologies and Diversifying into Adjacent Healthcare Fields ―

We will expand the adoption of our non-invasive hormone measurement kits while leveraging our proprietary trace mass spectrometry technologies to broaden our business in the around-the-pill field. In addition, through collaboration with startup companies, we will pursue opportunities in healthcare areas that can generate synergies with our prescription pharmaceuticals business.
Through these initiatives, we aim to establish new revenue streams and build a sustainable foundation for future growth.

Two Strategic Foundations

In addition to the Five Pillars Driving Growth, which serve as the primary engines of growth, the Group has identified Two Strategic Foundations as the key enablers that support sustainable growth from both management and financial perspectives. These foundations provide the organizational and financial infrastructure necessary to execute our growth strategy and enhance long-term corporate value.

Financial Strategy

―Advanced management with a focus on the cost of capital ―

Under a management approach that emphasizes capital efficiency, we will improve capital productivity through the introduction of management practices utilizing ROIC (Return on Invested Capital). We also recognize the enhancement of PBR (Price-to-Book Ratio) as a key management priority and will actively pursue initiatives to improve market valuation.
Based on these principles, we will strive to achieve an optimal balance between growth investments and shareholder returns through disciplined capital allocation. In addition, investments in research and development as well as M&A opportunities will be executed selectively and with a strong focus on capital efficiency, strategic fit, and long-term value creation.

Strengthening the Management Foundation

―Strengthening the management infrastructure to execute strategies ―

To reinforce the management foundation that supports sustainable growth, we will advance initiatives across four key areas: governance, human capital, digital transformation (DX), and ESG.
To further strengthen corporate governance, we have transitioned from a Company with an Audit & Supervisory Board to a Company with an Audit and Supervisory Committee. In conjunction with this transition, we have increased the proportion of independent outside directors to a majority of the Board, thereby enhancing both management transparency and oversight functions.
In addition, we will continue investing in human capital to develop the next generation of business leaders and highly skilled professionals. At the same time, we will promote digital transformation to enhance business processes, improve operational efficiency, and increase productivity, thereby strengthening the Group’s long-term competitiveness and sustainable growth potential.

Mid-Term Management Plan 2028 Presentation Materials

Webcast of Financial Results Meeting for FY2025 (Held on May 20, 2026)

Review of the Previous Mid-Term Management Plan

Evolution of the Mid-Term Management Plans

Since transitioning to a holding company structure in 2021, the Group has advanced the Mid-Term Management Plan 2025, strengthening its presence in specialty areas and expanding into new business domains. Building on these achievements, we have established our long-term vision, ASKA VISION 2035, and positioned the Mid-Term Management Plan 2028 as the first phase of its implementation roadmap. Through these initiatives, we aim to achieve sustainable growth and further enhance our corporate value.

Evolution of the Mid-Term Management Plans

Achievements and Progress of the Previous Mid-Term Management Plan

In the fiscal year ended March 2026, the final year of the Mid-Term Management Plan 2025, the Group achieved net sales of ¥71.1 billion, an operating margin of 8.2%, and ROE of 8.0%. As a result, we successfully attained all of the financial targets set forth in the Plan, including net sales of ¥70.0 billion, an operating margin of 8%, and ROE of 8%.

Progress Chart

Progress Chart
FY2020 FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 (Forecast)
Net Sales 55,181 56,607 60,461 62,843 64,139 71,127 73,000
OPM 6.5% 8.5% 8.4% 10.3% 8.3% 8.2% 8.5%
ROE 6.3% 8.8% 8.2% 13.0% 8.0% 8.0%

Overview of Financial Results for Fiscal Year Ended March 2026

The economic environment during the fiscal year ended March 2026 remained uncertain despite signs of a gradual recovery in Japan. Rising geopolitical risks, foreign exchange fluctuations, and continued inflation in resource and raw material prices placed upward pressure on costs. In the pharmaceutical industry, the business environment remained challenging due to ongoing healthcare cost containment measures, including regular drug price revisions, as well as rising raw material and manufacturing costs.
Despite these conditions, the Group achieved increases in both revenue and profit, driven primarily by the strong performance of key products. As a result, all financial targets set forth in the Mid-Term Management Plan 2025—net sales of ¥70.0 billion, an operating margin of 8%, and ROE of 8%—were successfully achieved.
Consolidated net sales for the fiscal year increased by ¥7.0 billion year on year to ¥71.1 billion. This was primarily attributable to the continued strong performance of products in the obstetrics and gynecology field within the prescription pharmaceuticals business, as well as the consolidation of Ha Tay Pharmaceutical Joint Stock Company (Hataphar), a Vietnamese pharmaceutical company that had previously been accounted for using the equity method.
Although the cost of sales ratio increased by 0.9 percentage points from the previous fiscal year, resulting in cost of sales of ¥37.0 billion, gross profit increased by ¥2.8 billion year on year to ¥34.1 billion due to higher revenue. Selling, general and administrative expenses rose by ¥2.3 billion to ¥28.3 billion, mainly reflecting increased investment in research and development. As a result, operating profit increased by ¥0.5 billion to ¥5.8 billion.
Ordinary profit amounted to ¥5.7 billion, reflecting non-operating income of ¥740 million and non-operating expenses of ¥908 million. Profit attributable to owners of parent increased by ¥323 million year on year to ¥5.4 billion, supported by gains on the sale of investment securities and fixed assets, partially offset by a loss on the valuation of investment securities.

Progress and Achievements of Key Strategic Initiatives

The Seven Strategic Initiatives identified as key priorities under the Mid-Term Management Plan 2025 progressed largely in line with plan. The Group achieved significant milestones, including attaining the No. 1 annual sales position in the obstetrics and gynecology market, strengthening its research and development capabilities, and expanding its business footprint across Southeast Asia through strategic collaborations with Hataphar and MedChoice. These achievements have contributed to the enhancement of the Group’s competitiveness and the establishment of a foundation for future growth.

Strategy Key Achievements
Corporate value enhancement through strengthened initiatives in specialty areas
  • ・ Maintained the No. 1 position in obstetrics and gynecology sales
  • ・ Preserved leadership in the thyroid disease market
  • ・ Expanded into new modalities, including digital therapeutics
Continuous creation of new drugs through cutting-edge drug discovery
  • ・ Launched SLYNDA® Tablets
  • ・ Initiated the Phase III clinical trial of AKP-022
  • ・ Initiated the Phase I/II clinical trial of LPRI-CF113
  • ・ Initiated the Phase I clinical trial of the proprietary compound AKP-021
  • ・ Introduced ion channel-based drug discovery platform technology
Expansion of overseas business
  • ・ Made Hataphar (Vietnam) a consolidated subsidiary
  • ・ Made MedChoice (Philippines) an equity-method affiliate
  • ・ Established a business platform for expansion in Southeast Asia and other overseas markets
Provision of new value aimed at the realization of Total Healthcare
  • ・Investments made through the Group’s Corporate Venture Capital (CVC) fund (8 portfolio companies)
  • ・ Commenced PFAS testing and analytical services
  • ・ Launched a non-invasive hormone measurement kit
  • ・ Launched pharmaceuticals for companion animals
  • ・ Launched new feed additives
Improvement of operational efficiency, reduction of costs, and strengthening of financial foundation
  • ・ Continued implementation of cost reduction initiatives (cost of sales ratio improved from 54.0% in FY2020 to 51.1% in FY2024)
  • ・ Optimized the portfolio of low-profitability products
  • ・ Improved operational efficiency through the promotion of digital transformation (DX)
  • ・ Strengthened the financial foundation by securing financing facilities
Fostering of an organizational culture that emphasizes compliance and reliability
  • ・Strengthened governance under the holding company structure
  • ・ Continued Quality Management Reviews
  • ・ Continued GMP Quality Management Reviews
  • ・ Continued implementation of compliance training programs
Human resources development for the realization of growth strategy
  • ・ Expanded flexible working arrangements
  • ・ Provided reskilling opportunities for employees
  • ・ Enhanced employee training and development programs
  • ・ Launched a global talent development program
  • ・ Launched a next-generation leadership development program

Business Environment

In addition to market changes such as annual drug price revisions under medical cost containment policies, issues related to pharmaceutical quality and supply, and the increasing difficulty of drug discovery, the environment continues to be highly challenging. This is further compounded by changes in the international situation, including the Russia–Ukraine conflict, global supply chain disruptions, and rising costs of energy, raw materials, and labor.

Changes in the Obstetrics and Gynecology Market

The obstetrics and gynecology market, which is the core of our group's ethical pharmaceuticals business, is expected to grow continuously.

Investors' Guide (Fiscal Year Ended March 2026)

Changes in the Environment Surrounding Women

Promotion of National Policies on Women’s Empowerment
  • Inclusion in the Basic Policy 2024 and Women’s Version of the Basic Policy 2024
  • Support for balancing women’s health issues—such as menstruation, pregnancy/childbirth, and menopause—with work
  • Introduction of the Gynecology-Specific Disease Treatment Management Fee (2020)
  • Insurance coverage for infertility treatment (2022)
Women’s Advancement in Society and Lifestyle Changes
  • Increase in the number of female employees and women in management positions
  • Greater understanding of women’s health issues, improved health literacy, and increased exposure through media and social networks
Advances in Medical Technology and Access Related to Women’s Diseases
  • Expansion of high-quality pharmaceuticals, particularly in Asia, to enhance presence
  • Diversification of treatments for dysmenorrhea and infertility
  • Expansion of internet access and online medical consultations

The Group's Share of the Obstetrics and Gynecology Market

Share of the Group's growth drivers, the uterine fibroid and endometriosis treatment RELUMINA and the dysmenorrhea treatment product line.

Investors' Guide (Fiscal Year Ended March 2026)

Risks and Opportunities

At ASKA Pharmaceutical Holdings, we identify the most critical issues to address by properly analyzing the current situation and the associated “opportunities” and “risks” from the perspective of their relevance to our businesses and social contribution, with the aim of achieving sustainable growth across the Group.
In particular, by focusing on materialities where our strengths can be maximized—namely “Contributing to women’s health and animal health”—the entire Group works on each initiative, thereby contributing to the achievement of the SDGs.

Background of Materiality Identification
S and G: Current situation – aging and declining birthrate, stricter corporate governance, annual drug price revisions, increased need for appropriate disclosure and explanation, importance of stable supply, promotion of diversity, globalization of human resources, increase in companion animals.
E: Current situation – significant climate change (abnormal weather), expansion of water resource risks, increasing waste and need for recycling, growing expectations for renewable energy.
S and G: Opportunities – changes in consumer preferences, rising momentum for women’s empowerment, expanding gender-conscious orientation, increasing expectations from other industries for a leading company in obstetrics and gynecology, diversification of companion animal diseases.
E: Opportunities – proactive initiatives on climate change risk leading to higher stakeholder evaluation, new business development contributing to environmental conservation through collaboration with suppliers.
S and G: Risks – pressure on healthcare finances from pandemics, threat of new entrants from other industries, rising manufacturing and operating costs, drug price revisions beyond expectations due to strained healthcare finances.
E: Risks – changes in disease structure due to greater-than-expected climate change, impact on stable procurement of raw materials from unforeseen disasters associated with climate change.

Impact of Drug Price Revisions Aimed at Containing Medical Costs, and Our Strategic Shift toward New Drug Development

Government drug price revisions containing medical costs previously took place biennially but shifted to an annual basis in 2021. Amid this persistent risk of drug price reductions, the business climate for pharmaceutical companies is more challenging than ever. Although there have been positive signs in such forms as repricing for unprofitable drugs in areas of high medical needs (aimed at ensuring a stable supply of pharmaceuticals while also addressing higher raw material costs) and premiums to promote innovation in drug discovery, annual drug price revisions continue to have a significant impact, with price cuts for generic drugs tending to surpass those for brand-name drugs. In response, the Group has focused on new drug development, seeking to increase the weighting of brand-name drugs with a view to stabilizing margins. We aim to realize sustained growth by continuing to roll out innovative new drugs.

ASKA Pharmaceutical’s Brand-name Drug Ratio, Drug Price Revision Rate, and Impact Rate

Financial and Capital Strategy

Strengthening capital efficiency management and financial strategy to maximize corporate value

(Updated: September 2025)

Business Environment Facing Execution of Our Medium-Term Management Plan

The ASKA Pharmaceutical Holdings Group is steadily advancing Medium-Term Management Plan 2025 to achieve sales of ¥70 billion, an operating profit margin of 8%, and ROE of 8% in FY2025, the final year of the plan. In FY2024, we achieved record-high sales of approximately ¥64 billion and both the operating profit margin and ROE exceeded 8%, attesting to steady progress in implementing the measures outlined in our growth strategy. These results fill us with confidence in our ability to meet the targets set in Medium-Term Management Plan 2025, as we also expect FY2025 sales to get a boost from Hataphar, the Vietnamese pharmaceutical company that we recently made a consolidated subsidiary. Currently, the domestic market for pharmaceuticals is experiencing headwinds in the form of structural factors such as annual drug price revisions and a declining domestic population, creating a highly challenging business environment for the industry. Pharmaceutical R&D entails risks such as extended development periods and uncertainty over the probability of success. As evidenced by numerous reports of competitors suspending or halting development of new drugs, R&D efforts do not always yield the expected results. Under these conditions, we believe that for the Group to continue enhancing corporate value over the longer term, it is essential that we take a strategic approach to building out and managing the business portfolio going forward, including in new businesses and domains, in addition to enhancing the value of products and expanding the pipeline programs in our therapeutic areas. Under Medium-Term Management Plan 2025, the ASKA Pharmaceutical Holdings Group aims to become a “total healthcare company with a strong foundation as a specialty pharma company.” To achieve the goals set in this plan, we have devised four visions and seven strategies. Among the latter is “Overseas operations.” Although the domestic market for prescription pharmaceuticals is expected to remain flat or shrink, in countries in Southeast Asia and other areas the pharmaceutical market is expanding amid a rapid increase in medical needs driven by population growth, rising income levels, and women’s advancement in society. Vietnam, in particular, is regarded as a high-growth market in view of its population of over 100 million, political stability, and good public order. Vietnam has a GDP growth rate of roughly 5–6% and its pharmaceutical market is worth an estimated approximately ¥630 billion, expanding at a brisk CAGR of 9.4%. Like Vietnam, the Philippines is a country maintaining stable GDP growth while continuing to expand its economy. Currently, its economic growth rate is a robust 5-6%. The Philippines’ population is now approximately 112.72 million* and its pharmaceutical market is worth an estimated approximately ¥700 billion, with more growth projected. Furthermore, the Philippines ranks third in East Asia and the Pacific in the World Economic Forum’s Global Gender Gap Index, demonstrating progress in the advancement of women in society. On the other hand, the Philippines is also known for regional disparities in medical infrastructure and access to healthcare. The Group believes that the Philippines represents a promising market in which we can create new growth opportunities through a strategy of addressing the health issues of local women, drawing on strengths cultivated over many years in Japan including our track record of stably supplying high-quality products, our expertise in Ob/Gyn, and our know-how concerning educational activities.
*Source: Japan External Trade Organization (JETRO)

FY2024 Progress toward Medium-Term Plan Targets and Future Challenges

Under the new holding company structure, our businesses comprise the pharmaceutical business, the animal health business, the testing business, and the overseas business. We seek to maximize our corporate value by drawing on these businesses’ collective knowledge, technologies, and know-how, and by fully leveraging synergies among Group companies. In the pharmaceutical business, it is difficult to sustain growth with existing products alone, given annual drug price revisions and patent cliffs. To maintain stable profitability, it is essential to continue developing or acquiring products with strong growth potential. To “Continuously create new drugs through advanced drug discovery,” one of the seven strategies outlined in Medium-Term Management Plan 2025, we are ramping up development and in-licensing activities with a view to fleshing out our pipeline, and accelerating efforts to enhance our discovery research structure. In FY2024, we in-licensed a new basic technology for ion channel drug discovery, expanding our research focus beyond the three existing priority areas of internal medicine, Ob/Gyn, and urology. New drug discovery is a long-term undertaking that can span decades and requires substantial investment. However, we believe that by expanding our revenue base by launching new drugs, we can enhance corporate value over the medium to long-term. We will continue to make strategic investments with this long-term perspective in mind. To date, our animal health business has centered on products for industrial livestock such as cattle and pigs. Recently, though, the companion animal market has been expanding as growth in stay-at-home demand since the COVID-19 pandemic has been accompanied by an increase in households keeping cats and dogs as pets. We plan to further expand our business in this field, and if we are to accurately address market needs in both the industrial and companion animal spheres we think it is important to actively pursue non-organic growth opportunities such as new product launches and M&A. In the testing business, while working to build up our presence in the clinical testing field, we are also actively expanding into the pet market, launching a feline hyperthyroidism test kit and a feline stress test kit in March 2025. Products such as these contribute to pet health management from an animal welfare standpoint. As a new initiative, we also launched a business focused on measuring environmental pollutants and began accepting contracts to measure levels of PFAS (per- and polyfluoroalkyl substances) in blood and water. We are developing and launching a range of test and measurement kits to meet the diverse needs of modern society, seeking also to help solve environmental issues. In our overseas business, we think it essential to pursue business in collaboration with partner companies well versed in local conditions. In addition to making Hataphar a consolidated subsidiary in February 2025, we acquired roughly 20% of shares in Philippine pharmaceutical group FTS Ambrose, making it an equity-method affiliate and establishing a collaborative framework with FTS Ambrose group company MedChoice Pharma. MedChoice Pharma’s strength lies in the endocrine field, specifically in thyroid hormone agents, where it has the second-largest market share in the Philippines. We aim to accurately meet local medical needs by harnessing both our expertise in raising awareness of thyroid diseases in the Japanese market, and our extensive experience in building a stable supply system. Through open innovation, the Group pursues not only in-house drug discovery but also in-licensing opportunities and joint research and development with external partners. Beginning in FY2024, we launched a research grant program for domestic academia to foster new collaboration opportunities based on promising technologies. We are accelerating the formulation of our next medium-term management plan, incorporating input from the frontlines of our pharmaceuticals, animal health, testing, and overseas businesses. In addition to strengthening our domestic operations centered on the growing Ob/Gyn field, we are pursuing expansion into high-growth overseas markets. We have set targets for sales and other indicators by backcasting from our envisioned position 10 years from now, and are working to formulate a sustainable and actionable growth strategy that also considers non-organic growth.

Optimizing Management That is Conscious of Cost of Capital and Share Price

We have identified price-to-book ratio (PBR) improvement as an important issue for management, and one that we addressed in 2023 when we issued the press release “ASKA Pharmaceutical Holdings Takes Action to Implement Management That is Conscious of Cost of Capital and Share Price.” In this press release, we outlined three initiatives to implement such management under the headings “Growth Strategy,” “Strengthen Shareholder Returns,” and “Strengthen IR Activities.” Under Growth Strategy, we are working to strengthen our pharmaceutical business, establish new businesses, and expand overseas, harnessing open innovation and external collaborations to strengthen our position in specialty areas. We plan to maintain or expand R&D investment at a level slightly above 10% of sales, positioning R&D as a key driver of sustainable growth. In our bid to become a total healthcare company, we are also ramping up capital and business alliances, M&A, and investments in promising fields. Our corporate venture capital fund, established in 2023 to address women’s health issues, has steadily expanded its portfolio and now invests in eight companies. We are also advancing our human resources strategy by nurturing individuals who embrace challenges and can respond to environmental change and global expansion. Under Strengthen Shareholder Returns, we have shifted from our previous stable dividend policy to a performance-linked profit-sharing method indicating a dividend payout ratio of 30%, also setting a minimum dividend per share to ensure ongoing consideration for dividend stability. In FY2024, we increased the annual dividend per share by ¥15 to ¥55, and we expect to pay an annual dividend of ¥55 in FY2025 as well (interim dividend of ¥27 and year-end dividend of ¥28). Under Strengthen IR Activities, we continue to hold financial results briefings twice annually and have been working to expand IR opportunities through initiatives such as one-on-one meetings with institutional investors and information sessions for individual investors. Furthermore, we have won increased recognition from outside the Company for our efforts to enhance the content of our integrated report, and in FY2024 we received the Best IR Award for Encouragement by the Japan Investor Relations Association. The Best IR Award for Encouragement is a great honor, as it underscores widespread recognition of our IR efforts. We have maintained return on equity (ROE), a benchmark for evaluating corporate value, at over 8% since FY2021 and expect to achieve our target of 8% in FY2025, the final year of Medium-Term Management Plan 2025. We will continue working to sustainably enhance ROE and demonstrate consistent growth to the market. To maintain ROE above the cost of shareholders’ equity, we are working to improve our product mix by focusing on the high-margin new drug business, while also enhancing the profitability of our core pharmaceutical business and expanding overseas operations. In our next medium-term management plan, which is currently being formulated, we aim to further improve ROE through the implementation of new business strategies. Through these initiatives, we seek to overcome challenges such as rising personnel and material costs and drug price revisions, and aim to strengthen our earnings base and achieve sustainable growth. Although our price-to-earnings ratio (PER), which plays an important role as a measure of corporate value alongside ROE, remains slightly below the industry average, it has been steadily improving. Enhancing both ROE and PER will contribute to a higher PBR. We have fostered this positive cycle through initiatives such as disclosing our policies on management conscious of cost of capital and share price and strengthening IR activities, raising PBR from around 0.6x in 2023 to above 1x at present. However, we recognize that surpassing 1x is only a starting point and that further improvement is necessary. We aim to improve PBR by enhancing our reputation, establishing a clear growth story, strengthening communication not only with institutional investors but also with individual investors, and deepening understanding and support for our business activities. In addition to enhancing profitability, optimizing the capital structure remains an important priority. We are rigorously managing working capital and fixed assets while continuing to reduce cross-shareholdings deemed to have limited strategic significance. These efforts to improve asset efficiency are expected to contribute to higher ROE, which in turn should lead to improvements in PER and PBR. As of March 31, 2025, cross-shareholdings accounted for 16.7% of consolidated net assets, down 1.7 percentage points from the previous fiscal year-end. We will continue to monitor ROE, PER, and PBR as inter-related indicators and work to further strengthen this virtuous cycle through profit growth, improved capital efficiency, and dialogue with investors, with the goal of maximizing corporate value.

PBR (price-to-book ratio) and ROE (return on equity)

Reduction in Cross-Shareholdings

Sustainable Management

The Group’s business is centered on pharmaceuticals, which we recognize as having significant public and social importance. Growing female participation in society and efforts to address women’s health issues have drawn increasing attention especially in recent years, even being referenced in the government’s Basic Policy on Economic and Fiscal Management and Reform. As part of these developments, we have focused on the Ministry of Economy, Trade and Industry’s 2024 report, Estimated Economic Losses due to Health Issues Specific to Women. Based on the estimated impact of menstrual symptoms on productivity and economic activity presented in the report, we calculated the economic impact of our pharmaceuticals in alleviating such symptoms, while newly quantifying the effects of our disease awareness initiatives. Through our efforts to quantify this impact, we have clarified our economic contribution in this field. These initiatives also underscore our social significance from a sustainability perspective and are viewed as key messages in our dialogue with stakeholders.

My Message as Director in Charge of Finance

With the recent change in president at this year’s General Meeting of Shareholders, the Group is now transitioning to a new stage in its evolution. Our mainstay pharmaceutical business remains our top priority, and we will continue to grow this business from the solid footing we have established already. We recognize that accelerating global expansion will be extremely important to our next medium term management plan. We plan to strategically pursue this objective with the aim of growing our global operations into a central foundation for future growth. We will continue to accurately identify new growth opportunities and boldly take on risks, steadily executing our growth strategies and strategic investments with a view to the future. In this manner, we seek to sustainably enhance our corporate value and meet the expectations of our shareholders. We appreciate your ongoing support for these endeavors.

Continue to take initiatives to swiftly achieve a PBR of above 1x

1. Growth strategy

(Updated: June 2026)

  • Implementation of growth strategy
  • Optimal cash allocation

Cash Allocation ResultsPlan for FY2023–2025

FY2025 Financial Results and Mid-Term Management Plan Presentation

 

Cash Allocation Plan for FY2026–2028

FY2025 Financial Results and Mid-Term Management Plan Presentation

 

2. Strengthen shareholder returns
(Updated: June 2026)
  • Beginning in the fiscal year ending March 2027, the Company will provide shareholder returns with a target total payout ratio of 40%, while aiming to enhance dividend levels in line with earnings growth.
  • To clearly demonstrate our commitment to returning profits to shareholders, we have adopted a progressive dividend policy (excluding special dividends). Under this policy, we will, in principle, maintain or increase dividends and avoid dividend reductions, thereby ensuring stable and sustainable shareholder returns.

Trend in Dividend per Share (% indicates dividend payout ratio)

Shareholder Returns

3. Strengthen IR activities

(Updated: Septmber 2025)

  • Creation of dialogue opportunities
  • Expansion of information disclosures

Governance

Basic Approach

Our Company continuously pursues the highest standards of corporate governance and is committed to its ongoing enhancement based on the following fundamental principles:

  1. We strive to ensure that shareholders’ rights are effectively protected and that all shareholders are treated equitably.
  2. We work to engage appropriately with stakeholders and foster a corporate culture that respects ethical business conduct.
  3. We appropriately disclose the Company’s financial, managerial, and other information to ensure transparency.
  4. The Board of Directors establishes an environment that enables bold management decisions based on corporate strategy, while exercising highly effective oversight of directors.
  5. We engage in constructive dialogue with shareholders.

Governance

Roundtable Discussion with Outside Directors

Non-Financial Strategies

”We aim to achieve our financial targets and contribute to the realization of the SDGs by addressing social issues through our business activities.”

Our Purpose

We will realize a healthy tomorrow and future for all lives

Mid-Term Management Plan 2028

Slogan

Deepening Our Core Strengths and Building the Business Foundation to Support Global Expansion for Sustainable Growth

FY2028 Financial Targets

Net Sales

¥85.0billion

Operating Profit Margin

10%

ROE

10%

Total payout ratio

40%

The Five Pillars Driving Growth

Domestic Pharmaceutical

Strengthening Profitability through Further Expansion in Specialty Areas

Drug Discovery

Accelerating Global Expansion

Global

Strengthening Business Foundations through New Plant Operations

Animal Health

Expanding Business through New Product Launches and Overseas Expansion

Testing and Around-the-Pill

Expanding the Testing Business through Trace Analysis Technologies and Broadening into Adjacent Healthcare Fields

Two Strategic Foundations

Financial Strategy

Advanced management with a focus on the cost of capital

Strengthening the Management Foundation

Strengthening the management infrastructure to execute strategies

6 Material Issues

1

Promotion of environmental management

2

Developing diverse human resources to enhance corporate value

3

Contributing to women's health and animal health

4

Stable supply of high-quality products and provision of appropriate information

5

Respect for human rights

6

Strengthening governance

Promotion of Sustainability

The ASKA Pharmaceutical Holdings Group pursues ESG management so that it can solve social issues through its business. In this, we are guided by the corporate philosophy, “Contribute toward the improvement of people’s health and progress in society through the development of innovative products.”
The Group has identified 11 material issues (most important issues). Of these, ”contribution to women’s health“ and ”contribution to animal health“ are particularly relevant material issues for the Company and are being promoted by the entire Group. We will also work to address climate change by reducing CO2 emissions through expanded use of solar power generation and the introduction of clean energy, and strengthen our human capital by developing and acquiring human resources capable of responding to new businesses and changes in the business and social environment, and by creating a working environment in which a diverse range of human resources, including women, career professionals, and seniors, can play an active role.
In April 2023, we established a new Sustainability Promotion Section in the Corporate Planning Department with the aim of further accelerating our efforts. We will continue to meet the expectations of our stakeholders by placing sustainability at the center of our management, striking a balance between maximizing the economic value of the Company and enhancing its social value.
Atsushi Maruo
Senior Managing Member of the Board of Directors,
Representative Director, in charge of Sustainability
ASKA Pharmaceutical Holdings

Basic Policy for Sustainability

The Company has established CSR guiding principles and works for the ongoing growth for the Group as a whole and to contribute to society. As a trusted company, we will increase profitability through sound business practices and fulfill our social responsibilities as a good corporate citizen.

  1. Supplying High-Quality Pharmaceuticals
    1. All employees conduct business with integrity guided by our corporate philosophy.
    2. We provide a stable supply of high-quality pharmaceuticals with excellent efficacy and safety profiles.
  2. Ensuring Compliance
    1. We are thoroughly committed to corporate ethics and to compliance with all laws and regulations.
    2. We maintain fair relationships with stakeholders and conduct transactions that are fair, transparent, and based on free competition.
    3. Regarding the protection of personal information, we manage the information in compliance with our privacy policy.
  3. Respecting Human Rights
    1. We respect the human rights of all people affected by our business practices.
    2. We respect the diversity of our employees and strive to foster a safe and comfortable corporate culture.
  4. Contributing to Communities and Society
    1. As a good corporate citizen, we communicate with the local community and broader society while striving to contribute to the world.
  5. Preserving the Environment
    1. We participate in the realization of a sustainable society through environmental preservation and by practicing environmental management.

Materiality Map

Mapping of Material Issues

The Group aims to become a total healthcare company with a strong foundation as a specialty pharma company. To contribute to solving social issues and building a sustainable society, we identified 17 materialities unique to our Company at the launch of the ESG Committee in 2021 (reorganized to 11 in October 2023, and further reorganized to 6 in April 2025).
In particular, “Contribution to Women’s Health and Animal Health” is considered a materiality where our strengths can be maximized. Based on the Medium-Term Management Plan, the Group works on these materialities as a priority, contributing to the realization of a sustainable society and aiming to enhance corporate value from a medium- to long-term perspective through sustainable growth and the creation of social value.

KPIs and SDGs for Material Issues

ESG Materiality KPI SDGs
E Promotion of Environmental Management
  • ①CO2 emissions reduction: Company-wide target "60% reduction compared to FY2013 (by FY2035)" / Domestic production site (Iwaki Factory) target "60% reduction compared to FY2013 (by FY2030)"
  • ②Reduction of total waste and maintaining/improving recycling rate at 90% or higher: Plastic recycling rate of 65% or higher (by FY2030)
  • ③Environmentally conscious business development
  • ④Reduction of environmentally hazardous substance emissions (mitigation of nitrogen load through the spread of low-protein feed)
  • ⑤Promotion of biodiversity
  • ⑥Thorough supply chain management and preferential purchase of environmentally friendly products

*This materiality will, for the time being, apply only to domestic business activities.

S Development of Diverse Human Resources for Enhancing Corporate Value
  • ①Promotion of autonomous learning (20 hours/person/year, training cost of 100,000 yen/person/year)
  • ②Promotion of diverse work styles: remote work, location-limited, shorter working hours, maintaining high & semi-high work engagement ratio (40% or higher)
  • ③Promotion of women’s participation (target for FY2029): Female managers (20%) / Female managerial candidates (30%)
  • ④Support for balancing work and life (diversity): Work support allowance, men’s childcare leave (average 20 days or more)
  • ⑤Annual paid leave utilization rate of 80.0% or higher (company-wide average)
  • ⑥Maintaining ICT environment for smooth operations inside and outside the company, ensuring flexible working styles and productivity improvement
  • ⑦Fostering DX talent to improve work process efficiency, thereby enhancing organizational productivity and improving employees’ work-life balance
Contributing to Women’s Health and Animal Health
  • ①Contribution to healthcare through dissemination of accurate knowledge and disease awareness in specialty areas (obstetrics/gynecology, thyroid)
  • ②Initiatives for sexual education of young people, and information dissemination on pregnancy, childbirth, and parenting
  • ③Promotion of animal welfare
  • ④Development and provision of useful products for maintaining the health of companion animals and livestock
  • ⑤Promotion of academic activities on veterinary pharmaceuticals and related diseases (especially reproductive/endocrine diseases)
  • ⑥Promotion of in-house research themes and strengthening of alliance activities
Stable Supply of High-Quality Products and Proper Information Provision
  • ①Strengthening value chain management
  • ②Compliance with relevant laws and regulations
  • ③Compliance with guidelines on promotional activities and strengthening training on information tools for MRs, etc.
  • ④Prompt provision of the latest information via the website
  • ⑤Promotion of awareness activities for proper use among veterinary pharmaceutical users (veterinarians, veterinary nurses, livestock producers, companion animal owners)
Respect for Human Rights
  • ①Efforts toward implementing human rights due diligence based on the ASKA Human Rights Policy
  • ②Employee education and awareness-raising for proper understanding of human rights
G Strengthening Governance
  • ①Fostering a corporate culture that respects sound business ethics, and appropriate disclosure and explanation of financial and non-financial information
  • ②Ensuring substantive equality of shareholders
  • ③Social contribution activities leading to solutions to social issues
  • ④Constructive dialogue with stakeholders
  • ⑤Promotion of compliance system centered on the Group Compliance Promotion Committee (continuous implementation of preventive measures against serious incidents, etc.)

Major Material Issue Initiatives Achievements

This section introduces the results of our efforts for material issue KPIs that are of particular interest to our stakeholders.
Our ESG Committee will oversee material issue initiatives and drive improvements.

E: Promotion of Environmental Management  *Limited to domestic business activities
Corresponding SDGs 7. Affordable and Clean Energy, 12. Responsible Consumption and Production, 13. Climate Action, 14. Life Below Water, 16. Peace, Justice and Strong Institutions
KPI FY2025 First Half Progress
CO2 Emissions Reduction: Companywide target – 60% reduction vs FY2013 (by FY2035)
Target at domestic production site (Iwaki Factory): 60% reduction vs FY2013 (by FY2030)
  • ◎ Initiatives at Iwaki Factory
    • (1) Introduction of solar power generation under PPA
    • (2) Installation of heat pumps
    • (3) Procurement of CO2-free electricity
    • (4) Commencement of operations at Community Center “arca”
    • (5) Completion of LED installation throughout the 3rd Formulation Building
  • ◎ At the companywide Energy Management Meeting, both annual and medium-to-long-term targets were reviewed and confirmed.
    • (1) Annual target: Reduce energy consumption intensity by 1% or more year-on-year.
    • (2) Medium- to long-term target: Reduce CO2 emissions by 46% compared with FY2013 by FY2030.
    • (3) Medium- to long-term target: Achieve a ratio of 50% or higher for non-fossil electricity in total electricity use by FY2030.
  • ◎ For electricity equivalent to 836,753 kWh used at the head office building in FY2024, obtained FIT Non-Fossil Certificates and Renewable Energy Certificates from the JPEX market in May 2025 (CO2 emissions reduced by 357 t-CO2).
Reduction of Total Waste and Maintenance/Improvement of Recycling Rate of 90% or Higher:
Waste plastic recycling rate of 65% or higher (by FY2030)
  • ◎ Initiatives at Iwaki Factory
  • (1) Total waste volume:
    145 t (FY2024)
    42 t (FY2025 Q1), 46 t (FY2025 Q2), total for the first half of FY2025: 88 t (of which 84 t recycled, 4 t final disposal)
  • (2) Recycling rate: FY2025 Q1: 95%, Q2: 96%, first half: 96%
  • ◎ ASW activities: Reconfirmed waste sorting, reduction, and recycling measures at the ASW Leaders’ Meeting.
  • ◎ Initiatives at Head Office
  • (1) Continued efforts to prevent misprints through authentication-enabled multifunction printers, promote paperless operations, and enforce waste separation. Continued reuse of stationery and envelopes.
  • (2) Continued collection of reusable paper from office paper waste.
Environmentally Conscious Business Operations
  • ◎ Continued compliance with the “Environmental Conservation Agreement” concluded with Fujisawa City and Kamakura City to maintain our environmental management framework.
  • ◎ At the Shonan Research Institute, prioritized introduction of non-CFC equipment for new and renewed installations, and purchased environmentally friendly office supplies.
  • ◎ Initiatives at Iwaki Factory:
  • (1) Full-scale operation of ISO 14001 Environmental Management System began in June.
  • (2) Participated in the Iwaki City “Adopt Program” as part of local volunteer activities.
  • (3) Reported monthly monitoring results to the Environmental Monitoring Center under the Iwaki City Pollution Prevention Agreement, which imposes stricter standards than national regulations.
  • (4) Participated in the “Iwaki Carbon Neutral Human Resource Development Consortium.”
  • ◎ Initiatives by the Supply Chain Management Department: Began examining the replacement of packaging materials (bottle and cap) with biomass-based materials.
  • ◎ Participated in the “28th Shonan International Village Meguri-no-Mori Tree Planting Festival” on May 11 (11 employees joined) to enhance employees’ environmental literacy.
Reduction of Environmentally Harmful Substances (Reduction of Nitrogen Load through Promotion of Low-Protein Feed)
  • ◎ Initiatives in Animal Health Business
  • (1) Contributed to protein reduction in compound feed through the promotion of L-Isoleucine.
  • (2) Contributed to farmland conservation through the sale of L-Lysine and other feed-use amino acids.
Promotion of Biodiversity
  • ◎ Green area management of the former Kawasaki site (under company management):
  • (1) Conducted monthly inspections and secured perimeter access routes.
  • (2) Implemented heavy pruning of tall trees to prevent damage from falling trees and to ensure safety of visitors and power lines.
  • (3) Conducted thinning of bamboo groves to allow sunlight penetration and protect steep slopes by controlling undergrowth.
  • (4) Maintained good relations with neighboring communities through appropriate site management and timely mowing.
  • ◎ Significantly improved weed control methods by shifting from post-growth mowing to the installation of anti-weed sheets (plus five other measures).
  • ◎ Expressed support for the TNFD recommendations, joined the TNFD Forum, and began disclosures aligned with the TNFD framework.
  • ◎ Distributed companywide training videos on biodiversity as part of the 10th AEN in April 2025 to enhance employees’ understanding of biodiversity.
Thorough Supply Chain Management and Preferential Procurement of Environmentally Friendly Products
  • ◎ Initiatives by the Supply Chain Management Department:
  • (1) Launched the Supply Chain Checklist (including CO2 emissions status).
  • (2) Updated the Supply Chain web page.
  • (3) Developed an Environmental Packaging Assessment Sheet to establish priorities with consideration of cost balance.
  • ◎ Promoted green purchasing of stationery and office supplies at the head office:
    Green product purchase ratio: 63% (April–September 2025)
  • ◎ Clarified the position of supply chain management in the companywide value chain mapping, with approval from the ESG Committee and the Responsible Officers’ Meeting.
S: Development of Diverse Talent to Enhance Corporate Value
Corresponding SDGs 3. Good Health and Well-Being / 5. Gender Equality
KPI Progress Report (First Half of FY2025)
Promoting Autonomous Learning
(20 hours per employee per year)
  • ◎ Average learning hours per regular employee: 11.5 hours (as of the end of September)
  • ◎ Initiatives to encourage self-development:
  • (1) Conducted training for new employees on the use of Udemy and flier.
  • (2) Promoted the use of Udemy Business and flier through internal communications (3 Udemy News issues and 3 flier News issues).
  • (3) Offered elective training programs to provide autonomous learning opportunities (4 programs with 39 participants in total).
  • ◎ Promoted independent learning initiatives in each department, including GCP training, English and Chinese language skill enhancement, and leadership development.
Promoting Diverse Work Styles:
Remote Work, Location-Specific Roles, Shortened Working Hours
Target Work Engagement Ratio: 40% or higher
  • ◎ Respected individual work–life balance by allowing employees to freely choose between on-site and remote work.
  • ◎ As of the end of September: 5 employees under the Regional MR Employee System and 5 under the Remote Work System; both systems were revised in April 2025.
  • ◎ Six employees utilized the short working hour system (mainly returnees from childcare leave), enabling flexible work arrangements according to family circumstances.
Promoting Women’s Empowerment (FY2029 Targets):
Ratio of Female Managers: 20% / Ratio of Female Manager Candidates: 30%
  • ◎ Held in-house roundtable discussions to share views and experiences of employees balancing childcare and work, alongside childcare leave programs exceeding legal standards.
  • ◎ Conducted regular D&I training programs and enhanced the work environment to support women’s continuous career development through life events, resulting in an increase in the ratio of female managers to 14.1% (FY2020: 6.5%).
Initiatives for Work–Life Balance (Diversity):
Work Support Incentive / Average Paternity Leave of 30 Days or More
  • ◎ Operated and promoted the “Work Support Incentive System,” compensating employees who supported the workload of colleagues on leave (58 employees supported 17 absentees).
  • ◎ Established a dedicated consultation desk and internal portal to alleviate concerns regarding long-term childcare leave. Promoted paternity leave, resulting in an increase in average leave days (First Half of FY2025: 31.2 days; FY2024: 16.28 days).
  • ◎ Paternity leave acquisition rate: 100% (10 male employees took leave for 8 childbirths). Seven employees took more than one month of leave, with guidance provided to all managers to encourage and facilitate leave acquisition (100% implementation).
Annual Paid Leave Utilization Rate: 80% or Higher (Company-Wide Average)
  • ◎ Annual paid leave utilization rate: 44.7% (Managers: 41.6%, Staff: 46.3%, as of the end of September). Communicated company-wide the FY2025 target of achieving 80% or higher utilization as part of workstyle guidelines.
Maintaining an Effective ICT Environment to Facilitate Flexible Work and Enhance Productivity
  • ◎ Supply Chain Management Department conducted “Planner” study sessions based on feedback from DX promotion activities.
  • ◎ Network environment renewal, scheduled for activation in the second half, is expected to enhance access speed and security. Improved iPhone communication performance will also strengthen tethering connections.
Developing Digital Transformation (DX) Talent to Improve Operational Efficiency, Organizational Productivity, and Work–Life Balance
  • ◎ Introduced a training program for new employees utilizing generative AI to learn about the company’s history and business development, fostering a foundation for DX capabilities.
  • ◎ Provided internal education on AI/RPA and related technologies, disseminating information to strengthen digital literacy and promote DX talent development, thereby enhancing productivity and operational efficiency.
S: Contributing to Women’s Health and Animal Health
Relevant SDGs 3. Good Health and Well-being / 5. Gender Equality
KPI Progress Report for the First Half of FY2025
Contribution to Healthcare through Disease Awareness and Dissemination of Accurate Knowledge in Specialty Areas (Obstetrics & Gynecology, Thyroid Disorders)
  • ◎Endocrinology Business Promotion Office: Published an article on thyroid disease awareness in the April–May issue of *Metropolitana*, an information magazine by Sankei Shimbun. Conducted a web seminar for municipal health promotion officers on women’s life stage-specific health issues, focusing on female and thyroid hormones, among other initiatives.
  • ◎Shonan CMC: Progressed development of three gynecology products toward market launch, including obtaining approval for LF111 (Sulinda Tablets 28).
  • ◎Sales Division: Provided appropriate usage information through national and regional seminars on topics such as hepatic encephalopathy and contraception (15 national lectures, 41 regional sessions, 13 or more co-sponsored seminars).
  • ◎Held the ASKA Media Seminar to promote awareness and understanding of new contraceptive options, reaching 54 media representatives and investors, and featured in publications such as *Yakujinippo*, *Answers News*, *Iji Shinpo*, and *Mizuho Securities* reports.
  • ◎Hosted the “Mint Meeting – Voices that Empower Women” on June 25, engaging approximately 50 women in their 20s–30s to share accurate information on women’s health and the importance of gynecological consultation.
Initiatives for Providing Information on Sex Education and Reproductive Health from Adolescence through Childrearing
  • ◎Exhibited informational booklets on contraception and emergency contraception at “Seminars on Contraception and STI Prevention for Educators” (2 events, approx. 300 participants).
  • ◎Added new content on contraception and preconception care to the “Mint⁺ Teens” website, and continued outreach to younger audiences via 27 Instagram posts.
  • ◎Distributed 170,040 copies of the supplementary educational booklet “What High School Students Should Know About Sexual Health” free of charge to 411 high schools across Japan.
Promotion of Animal Welfare
  • ◎Shonan Research Institute initiatives:
  • (1) Published ethical considerations for research on the corporate website.
  • (2) Conducted animal experiments in compliance with in-house regulations and Shonan iPark Animal Experiment Rules, within AAALAC-accredited facilities.
  • (3) Participated in the Shonan iPark Animal Memorial Service held on September 11.
  • ◎Contributed to animal welfare through the development, manufacture, and sale of veterinary pharmaceuticals, feed additives, and supplements.
Development and Provision of Products Contributing to the Health of Companion and Livestock Animals
  • ◎Submitted an application for manufacturing and marketing approval of an endocrine drug for dogs.
  • ◎Obtained approvals and made necessary changes to ensure a stable supply of products for companion and livestock animals.
Promotion of Academic Activities Related to Veterinary Medicines and Associated Diseases (Especially Reproductive and Endocrine Disorders)
  • ◎Produced an educational video on Cushing’s syndrome associated with Trilostane Tablets “ASKA,” featuring academic experts.
Promotion of In-house Research Themes and Strengthening of Alliance Activities
  • ◎Shonan Research Institute initiatives:
  • (1) Actively leveraged open innovation to explore new research areas.
  • (2) Introduced foundational drug discovery technologies targeting ion channels.
  • (3) Conducted a public call for joint drug discovery research targeting academic and public-sector researchers in Japan.
  • ◎International Business Division: Promoted the search for new potential partners in Southeast Asia.

Materiality